Grand Steel Piling
/ Convention Centre Bridge-Piling, Melbourne, Australia

Convention Centre Bridge-Piling, Melbourne, Australia

2510 tons of GPZ21 685x402x10 Length varying from 11.5m to 20m. supplied in welded pairs. slinging holes.The soils consisted of firm to stiff sandy clay and the working load was 100kN. Access to the site for plant and materials was only possible by floating craft, and a temporary wharf 2 miles upstream was used for loading all plant and materials. A spud leg piling pontoon, made up of 20 uniflotes, was constructed for carrying the piling plant and a further 6 flote pontoon was made up and used for transporting materials. A 250HP workboat was used to move and position the pontoons.

Project Photos

Live Draw HK Judi Online Judi Slot Online Jackpot Terbesar Situs Judi Slot Online Terpercaya 2020 Slot Bonus New Member Situs Slot Gacor Slot Online Bandar Togel dan Slot Slot Judi Onlain Slot Gacor Link Judi Onlain Situs Judi Onlain Daftar Situs Judi Slot Online Terpercaya Gacor Slot Slot Gacor Hari Ini Togel Terpercaya Judi Onlain Slot Situs Judi Online Space Togel Judi Slot Online Bandar Judi 4D