Grand Steel Piling
/ Warri Port Land Relamation Nigeria

Warri Port Land Relamation Nigeria

3200 tons of GPU32. all in 18m. The existing seabed was between approximately -2.0 EL to +1.0 EL in the vicinity of the proposed wall. Subsequent filling activity has reclaimed the area to approximately +3.0 EL. Fill material is dense to very dense sandy gravel with cobbles and boulders.Installation was done by pitching the sheet piles in a piling frame and driving to refusal with an ICE 815 vibro hammer. Piles were then driven to the final required level using an IHC S90 hydraulic hammer, together with a pile helmet

Project Photos

Previous:

Next: Portsmouth docks, UK