Section |
Dimensions |
Mass |
Modulus of Section |
Moment of inertia |
|||
Width |
Height |
Thickness |
Per pile |
Wall |
|||
w |
h |
t |
|
|
|
|
|
mm |
mm |
mm |
kg/m |
kg/m2 |
cm3/m |
cm4/m |
|
JU400*100 |
400 |
100 |
10.5 |
48 |
120.1 |
874 |
8740 |
JU400*125 |
400 |
125 |
13 |
60 |
149.9 |
1340 |
16800 |
JU400*170 |
400 |
170 |
15.5 |
76.1 |
190.4 |
2270 |
38600 |
JU600*180 |
600 |
180 |
13.4 |
81.6 |
136 |
1800 |
32400 |
JU600*204.5 |
600 |
204.5 |
9.4 |
69.2 |
115.3 |
1605 |
32858 |
JU600*205.5 |
600 |
205.5 |
10.9 |
76.4 |
127.4 |
1817 |
37348 |
JU600*205 |
600 |
205 |
10 |
72.1 |
120.1 |
1690 |
34645 |
JU600*210 |
600 |
210 |
18 |
106.2 |
177 |
2700 |
56700 |
JU600*215 |
600 |
215 |
14 |
89.5 |
149.2 |
2343 |
50376 |
JU600*218.5 |
600 |
218.5 |
15.4 |
98.9 |
164.8 |
2660 |
58118 |
JU600*225 |
600 |
225 |
22.3 |
132.3 |
220.8 |
3884 |
104873 |
JU600*226 |
600 |
226 |
19 |
114 |
190 |
3200 |
72320 |
JU750*225 |
750 |
225 |
14.6 |
110.4 |
147.2 |
2502 |
56301 |
Lassen622T |
600 |
206 |
14 |
86.9 |
144.8 |
2206 |
45441 |
Larssen sheet pile locate publicly JU600*180 oriented uses JU600*204.5 in ground floors along major perpendicular JU600*205.5 connections, including retail shops and restaurants. The lower portion of the diversion levees would be constructed in the wet by end dumping rockfill into JU600*180 the river from the shore or the levee crest. The rod is placed in the casing and driven a foot JU600*204.5 or more into the bottom to force a sample of material into the sample pipe.
U type steel sheet pile JU600×180 program ground floors JU600×204.5 to accommodate retail, restaurant, JU600×205.5 and other public uses. The levees would still divert JU600*205.5 most of the flow through the new channels. The casing stands in place until the rod and sample pipe are removed with the dry sample.
Minimize curb-cuts, JU600×180 and do not locate service entrances along major perpendicular connections. Should design progress to the next stage JU600×204.5, detailed model studies would be performed to ascertain actual flow conditions. Core drilling is necessary JU600×205.5 for rock stratum and for soils containing clay or clay with boulders.