Section

Dimensions

Mass

Modulus of Section

Moment of inertia

Width

Height

Thickness

Per pile

Wall

w

h

t

 

 

 

 

mm

mm

mm

kg/m

kg/m2

cm3/m

cm4/m

JU400*100

400

100

10.5

48

120.1

874

8740

JU400*125

400

125

13

60

149.9

1340

16800

JU400*170

400

170

15.5

76.1

190.4

2270

38600

JU600*180

600

180

13.4

81.6

136

1800

32400

JU600*204.5

600

204.5

9.4

69.2

115.3

1605

32858

JU600*205.5

600

205.5

10.9

76.4

127.4

1817

37348

JU600*205

600

205

10

72.1

120.1

1690

34645

JU600*210

600

210

18

106.2

177

2700

56700

JU600*215

600

215

14

89.5

149.2

2343

50376

JU600*218.5

600

218.5

15.4

98.9

164.8

2660

58118

JU600*225

600

225

22.3

132.3

   220.8

3884

104873

JU600*226

600

226

19

114

190

3200

72320

JU750*225

750

225

14.6

110.4

147.2

2502

56301

Lassen622T

600

206

14

86.9

144.8

2206

45441

 

Larssen sheet pile locate publicly JU600*180 oriented uses JU600*204.5 in ground floors along major perpendicular JU600*205.5 connections, including retail shops and restaurants. The lower portion of the diversion levees would be constructed in the wet by end dumping rockfill into JU600*180 the river from the shore or the levee crest. The rod is placed in the casing and driven a foot JU600*204.5 or more into the bottom to force a sample of material into the sample pipe.

 

U type steel sheet pile JU600×180 program ground floors JU600×204.5 to accommodate retail, restaurant, JU600×205.5 and other public uses. The levees would still divert JU600*205.5 most of the flow through the new channels. The casing stands in place until the rod and sample pipe are removed with the dry sample.

 

Minimize curb-cuts, JU600×180 and do not locate service entrances along major perpendicular connections. Should design progress to the next stage JU600×204.5, detailed model studies would be performed to ascertain actual flow conditions. Core drilling is necessary JU600×205.5 for rock stratum and for soils containing clay or clay with boulders.