Section | Dimensions | Sectional Area |
Mass | Moment of inertia |
Modulus of section |
|||
Width | Height | Thickness | Pile | Wall | ||||
B | H | t | ||||||
mm | mm | mm | cm2/m | kg/m | kg/m2 | cm4/m | cm3/m | |
SCH3-700 | 700 | 146 | 4 | 56 | 30.8 | 44 | 1945 | 265 |
SCH4-700 | 700 | 148 | 6 | 84.3 | 46.2 | 66 | 3080 | 410 |
SCH5-750 | 750 | 250 | 4 | 63.6 | 37.4 | 49.9 | 6535 | 511 |
SCH6-750 | 750 | 251 | 5 | 79.2 | 46.6 | 62.2 | 8142 | 632 |
SCH7-750 | 750 | 252 | 6 | 94.68 | 55.7 | 74.3 | 9732 | 750 |
SCH10-750 | 750 | 253 | 7 | 116.6 | 68.6 | 91.5 | 11880 | 956 |
SCH11-750 | 750 | 254 | 8 | 133.5 | 78.6 | 104.8 | 13586 | 1093 |
Cold formed sheet pile SCH6-750 SCH7-750 and SCH10-750 should be placed in Sydney and Brisbane- to eight-inch layers and thoroughly compacted with power tampers. Fall protection is required as well at depths of six (6) feet or greater even if the person is considered to be directly involved with the excavation process. Where, TT ,SCH6-750 is the applied test load at failure of the connection or at 0.75 inches displacement within the connection whichever is the least. Filling the bins should closely follow the assembly of SCH 11-750 the structure to avoid storm damage or displacement of the bins by earth movement. When the soil reinforcement is connected to the facing at multiple SCH7-750 closely spaced locations, group action shall be considered in the test set-up Grand Piling when verifying the connection capacity. An engineer or other professional conducting a quality assurance inspection.
Keeping the bin fill above the fill level behind the wall adds stability to the structure. Connection materials shall be designed to accommodate losses due to corrosion in accordance with Article 5.9.3.4.1.1. Pits, excavations, trenches, or caissons with vertical sides that expose employees to a fall SCH10-750 hazard six (6) feet or greater shall be guarded by standard guard rails, fall restraint, or fall arrest systems in Sydney and Brisbane. The material SCH 10-750 strengths of the test connection samples shall be determined Grand Piling and the value for,TT , shall be corrected when these determined material strengths exceed the minimum specified strengths for these materials.
Sheet piles SCH11-750 SCH 6-750 and SCH 7-750 may require that fill be placed behind the Auckland or Adelaide wall concurrently with erection and bin filling, but placing fill behind the wall should never precede filling of the bin. Potential differences between the environment at the face relative to the environment within the reinforcement soil mass shall be considered when assessing potential corrosion losses. If SCH11-750 fall protection is unable to be constructed a warning line fifteen (15) feet from the unprotected edge or opening shall be erected. Adequate compaction SCH 7-750 eliminates damaging drag-down forces.The amount of compaction required depends on the soil type, lift height and bin height. If this fifteen (15) distance can’t be maintained, or would create a more hazardous condition approval from the Resident Engineer and Manager of Construction Safety must be SCH 6-750 submitted in writing for approval. The basic design factored load shall be a distributed horizontal load acting on the entire back face of the face element the resultant of which is equal 1.8 times the sum of the,Ta , values of the soil SCH 6-750 reinforcement connected to the face element.
Since many walls are major structures, extra care is mandatory for this important step, especially on higher walls. Higher degrees of soil compaction are required closer to the base of the wall. Stringer and spacer corrugations should be filled with compacted material. Always avoid damaging the SCH 7-750 structural members with equipment. Exception: Working at an excavation site where appropriate sloping of side SCH11-750 walls has been implemented as the excavation protection Auckland or Adelaide system. Concrete and steel facing elements shall be structurally designed in accordance with Sections 8 and 10 respectively using the strength design method provisions.
Piling sections SCH 10-750 and SCH 11-750 are vital to the Grand Piling performance of the wall. The employees are on the protective system or any other structure in the excavation. The location of the resultant of this distributed load shall be at the location of the resultant of the, Ta , values of the same soil reinforcement. Working Over Water Particular attention is required to the SCH 10-750 area behind the wall. When working above water, the Contractor shall provide fall protection if the distance from the walking/working surface to the walking/working surface to the waters surface is ten (10) feet or more. Top of wall facing elements which support a traffic barrier SCH10-750 support slab shall be designed for a horizontal line load acting at the top rear of the facing elements and equal to 1.9 kips per foot.
Unless absolutely certain SCH7-750 that no water will enter this area (either from subsurface sources or from the surface above the wall), perforated pipe, with a positive outlet, surrounded by pervious backfill should be installed behind and SCH 11-750 below the rear base of the retaining wall. The use of fall protection, including fall protection that eliminates drowning hazards, does not relieve the Contractor from having to provide ring buoys and a lifesaving skiff. This load is to be considered a SCH6-750 factored load, and does not need to be combined with the basic design factored load specified above.