Section |
Dimensions |
Mass |
Modulus of Section |
Moment of inertia |
||||
Width |
Height |
Thickness |
Per pile |
Wall |
|
|
||
w |
h |
t |
s |
|
|
|
|
|
mm |
mm |
mm |
mm |
kg/m |
kg/m2 |
cm3/m |
cm4/m |
|
600 |
309 |
6.0 |
6.0 |
41.9 |
70 |
625 |
9 670 |
|
600 |
310 |
6.5 |
6.4 |
44.1 |
74 |
675 |
10 450 |
|
600 |
311 |
7.2 |
6.9 |
46.3 |
77 |
740 |
11 540 |
|
600 |
312 |
7.3 |
6.9 |
47.4 |
79 |
745 |
11 620 |
|
600 |
312 |
7.5 |
7.1 |
48.5 |
81 |
770 |
12 010 |
|
600 |
313 |
8.0 |
7.5 |
50.8 |
85 |
820 |
12 800 |
|
600 |
316 |
9.0 |
6.8 |
55.8 |
93 |
990 |
15 700 |
|
600 |
318 |
10.0 |
7.4 |
60.2 |
100 |
1 095 |
17 450 |
|
600 |
320 |
11.0 |
8.0 |
64.6 |
108 |
1 200 |
19 220 |
|
600 |
418 |
9.0 |
7.4 |
59.9 |
100 |
1 270 |
26 590 |
|
600 |
420 |
10.0 |
8.0 |
64.3 |
107 |
1 400 |
29 410 |
|
600 |
422 |
11.0 |
8.6 |
68.7 |
115 |
1 530 |
32 260 |
|
600 |
430 |
10.2 |
8.4 |
72.6 |
121 |
1 670 |
35 950 |
|
600 |
430 |
11.2 |
9.0 |
76.9 |
128 |
1 800 |
38 650 |
|
600 |
430 |
12.2 |
9.5 |
81.1 |
135 |
1 920 |
41 320 |
|
600 |
450 |
11.1 |
9.0 |
81.9 |
137 |
2 060 |
46 380 |
|
600 |
450 |
12.1 |
9.5 |
86.1 |
144 |
2 200 |
49 460 |
|
600 |
450 |
13.1 |
10.0 |
90.4 |
151 |
2 335 |
52 510 |
|
600 |
452 |
14.2 |
9.7 |
97.4 |
162 |
2 680 |
60 580 |
|
600 |
454 |
15.2 |
10.1 |
101.8 |
170 |
2 840 |
64 460 |
|
600 |
456 |
16.2 |
10.5 |
106.2 |
177 |
3 000 |
68 380 |
|
600 |
452 |
18.5 |
10.6 |
109.9 |
183 |
3 065 |
69 210 |
|
600 |
452 |
19.5 |
11.0 |
114.1 |
190 |
3 200 |
72 320 |
|
600 |
452 |
20.5 |
11.4 |
118.4 |
197 |
3 340 |
75 410 |
|
400 |
290 |
12.7 |
9.4 |
62.0 |
155 |
1 560 |
22 580 |
|
400 |
292 |
15.0 |
9.7 |
69.3 |
173 |
1 785 |
26 090 |
Sheet piles GU10N is offers a mix of GU11N,GU12N architectural and civil many of to engineering services related to construction. The company is one of the many foreign contractors GU 11N operating in the country.
The sector’s GU10N helps explain why President Rodrigo has granted exemptions to keep running despite the broader lockdown. The hassles of getting to work during curfew, however, make GU10N,GU11N loophole almost worthless. Sebastian, who runs the facility, scrambled to keep GU12N operations running after announcement. She originally set aside space for workers to sleep and eat, then resorted to GU 10N distributing laptops to staff who faced obstacles commuting, given curbs on public transport.
The steel sheet piling GU 11N,GU 12N are Integrity testing by GU 10N Method shall conform to pile. High-Strain Dynamic Method shall be applied to confirm the design parameters and capacities assumed for the piles as well as to confirm the normal integrity of testing GU11N the piles. It is considered supplemental to the low-strain and sonic-type integrity testing of the cast-in-place piles.GU 12N a non-destructive relatively quick test and it is intended that the test shaft be left in a condition suitable for use in production.