Grand Steel Piling
/ Knowledge /sheet piles(SPU I, SPU II, SPU III, SPU IIIA, SPU IV, SPU VL, SPU VIL, SPU IIW, SPU IIIW, SPU IVW)

sheet piles(SPU I, SPU II, SPU III, SPU IIIA, SPU IV, SPU VL, SPU VIL, SPU IIW, SPU IIIW, SPU IVW)

 

Section Dimensions Sectional
Area
Mass Moment
of inertia
Modulus
of section
Width Height Thickness Pile Wall
b h t          
mm mm mm cm2/pile kg/m kg/m2 cm4/m cm3/m
SPU I 400 85 8 45.21 35.5 88.8 4500 529
SPU II 400 100 10.5 61.2 48 120 8740 874
SPU III 400 125 13 76.4 60 150 16800 1340
SPU IIIA 400 150 13.1 74.4 58.4 146 22800 1520
SPU IV 400 170 15.5 97 76.1 190 38600 2270
SPU VL 500 200 24.3 133.8 105 210 63000 3150
SPU VIL 500 225 27.6 153 120 240 86000 3820
SPU IIW 600 130 10.3 78.7 61.8 103 13000 1000
SPU IIIW 600 180 13.4 104 81.6 136 32400 1800
SPU IVW 600 210 18 135.3 106 177 56700 2700

 

Sheet piles SPU IV,SPU II and SPU III are policies that have JIS5528 proven successful SPU IIIA at addressing the challenges of maintaining the industry’s job standards and making sure local communities benefit from investment in SPU 1 large-scale construction SPUI projects. Timber or steel facing elements (lagging members) simply supported at the vertical support elements may be SPUII designed for a reduced JIS 5523 bending moment to account for soil arching except when retaining soft cohesive soils.

 

At least one serviceable 10-pound ABC-rated fire extinguisher shall be readily accessible to all welding or similar operations. Project Labor Agreements (PLAs) are a proven and effective strategy to ensure that SPUIII local development translates into middleclass construction jobs. When applicable the maximum design JIS 5528 moment may be taken as 0.8 times the calculated moment using the design lateral pressures. Timber facing elements should be constructed from stress-grade lumber SPUIIIA which has been SPU 2 pressure treated with a perservative. Scope This section defines the minimum requirements for fire prevention and protection on Port of Seattle Construction SY295 projects. Coupled with local hire agreements, PLAs can create training and job opportunities that transform the lives of SPUIV workers and their families for the long term. The support slab shall be designed so only horizontal and vertical forces are transmitted to the vertical support elements of the wall.

 

Steel sheet pile SPU IIW and SPU IIIW minimize the SPU IVW possibility of JIS 5528 SY295 and SY 390 , property damage, and schedule impacts to Contractor’s personnel or those utilizing the Port facility. They also benefit employers by ensuring safety training and reducing costly on-the-job SPUVL injuries. When SY390 traffic barriers are placed at the top of nongravity cantilevered walls they shall be constructed on a support slab which is designed to resist the overturning due to the SPU 3 design horizontal impact load SPUVIL applied to the barrier. The support slab shall be continuous the full length of the wall with no expansion joints.

 

Project SPU VL and SPU VIL are collective SPU I bargaining agreements between JIS 5523 SYW 295 and SYW 390 the unions representing the building trades and developers that ensure that both parties benefit from large construction projects. The horizontal forces from the support slab applied to the SPUIIW vertical support elements need to be considered in the design of these vertical SYW295 support element. Means SPU 3A so resistant to fire that, for specified time and under conditions of standard heat intensity, it will not fail structurally and will not permit the side away from the SPUIIIW fire to become hotter than a specific temperature. The horizontal force from the support slab shall be applied to the top of the vertical support elements. Traditionally, contracting is done between the owners of the project and the general contractor.

 

For discrete vertical support SPUIVW elements the minimum design force shall be 20 kips or 3.5 kips times the spacing of the vertical support elements whichever is SPU 4 greater but need not exceed 40 kips. General The Contractor shall be SYW 390 responsible for development and implementation of a fire SPU I protection and prevention program to be followed throughout all phases of construction. These design forces may be considered factored loads. The design lateral earth pressure SPU II from the retained soil need not be considered to act concurrently with the above design forces.

 

However, PLAs give the building trades a role in setting out conditions of employment for the construction workers on a SPU III project, including wages, benefits, and hours of work.For continuous vertical support elements the SPU 5 minimum force shall be 3.5 kips per foot. All fuel-powered equipment shall be provided with at least one serviceable 5-pound ABC- rated fire extinguisher. They usually include SPU IIIA no-strike/ no-lockout and dispute resolution SPU 6 provisions, which are intended to prevent delays on a project. All job site offices shall be equipped with at least one serviceable 10-pound ABC-rated fire extinguisher. The calculated embedment, Do, shall provide a SPU IV minimum factor of safety against overturning equal to 1.0 ( FSOT > 1.0 ) for the above loading using the simplified analysis method.

 

In addition, contractors agree to hire workers from union hiring halls, including apprentice level workers who come from SPU 2W programs that are jointly sponsored by the unions representing the building trades and contractors. A serviceable fire extinguisher, rated not less than 2A, shall be provided for each 3000 square feet of the building area, or major fraction thereof. California has a SPU VL long history of utilizing PLAs as a tool to guarantee a return on local investment in construction projects, beginning in SPU IIIW 1938 with the construction. At least one portable fire extinguisher having a rating of not less than 2A:10B shall be located outside of, but not more than 10 feet SPU VIL from, the door opening into any room used for SPU 3W storage. When traffic barriers are SPU IIW placed at the top of non-gravity cantilevered walls embedded in soil or rock, the minimum design height, H, shall be 6 feet, and the minimum length of wall and barrier slab shall be 60 feet.

 

At least one portable SPU 4W fire extinguisher having a rating of not less than 20B units must be located not less than 10 feet and no more than SPU IVW , from any Class I or Class II liquid storage area located outside of a storage room but inside a building.