Profile | Dimensions | Weight | Section Modulus |
Moment of Inertia |
|||
w | h | d | Single pile | Wall | |||
mm | mm | mm | Kg/m | Kg/m2 | |||
KL 3/4 | 700 | 146 | 4 | 31.6 | 45.2 | 276 | 2042 |
KL 3/5 | 700 | 147 | 5 | 39.1 | 55.8 | 339 | 2502 |
KL 3/6 | 700 | 148 | 6 | 46.2 | 66 | 410 | 3080 |
KL 3/7 | 700 | 149 | 7 | 54.6 | 78 | 460 | 3500 |
KL 3/8 | 700 | 150 | 8 | 61.5 | 88 | 540 | 4050 |
TKL 3/9 | 700 | 160 | 9 | 74.8 | 106.9 | 680 | 5120 |
It is the KL 3/4 KL 3/5 KL 3/6 sheet piles to review the pertinent trench sheet information from this meeting at their worksite. Regardless of the wall foundation type, borings shall extend into a bearing layer adequate to support the anticipated foundation loads, defined as dense or hard soils, or bedrock. The construction industry is one of the few industries where workers with little formal education can gain the skills to command family-supporting wages. All Contractor and Consultant personnel working on the Port of KL 3/4 trench sheet Seattle construction projects shall receive a site safety orientation prior to commencing work. For piles or shafts end bearing on rock, or shafts extending into rock, a minimum of 10 feet of rock core, or a length of rock core equal to at least three times the TKL 3/9 shaft diameter, which ever is greater. High quality apprenticeship programs—jointly sponsored by construction unions and the contractors who employ them—provide training to new recruits valued at between $40,000 and $150,000.
It shall be obtained to insure that the exploration has not been terminated on a boulder and to determine the physical characteristics of the KL 3/5 trench sheets rock within the zone of foundation influence for design. Orientations for off-shift work can also be scheduled by contacting the POS Construction Safety Services office at (206) 787-7936. These on-the-job training programs can provide a KL 3/8 pathway out of poverty. Attendees will receive a safety handbook and be apprised of site-specific safety procedures and the Zero Accident/Injury goal of the POS.
5A minimum of one soil boring shall be made for each TKL 3/9 retaining wall. The presence of unions in the industry has significantly boosted wages, expanded health care coverage, and improved safety. In Los Angeles County, union KL3/7 construction workers earn 64 percent more than their non-union counterparts. The Prime Contractor shall orientate employees and Sub-tiered Contractor employees to the specific rules found in their KL 3/6 trench sheeting site-specific safety & health plan. In planning the exploration program, consideration should be given to placing borings inboard and outboard of the wall line to define conditions in the scour zone at the toe of the wall and in the zone behind the wall to estimate lateral loads and anchorage capacities
Upon completing KL 3/7 KL 3/8 TKL 3/9 sheet piling, unionized construction workers can earn up to $70,000 a year. Approximately 80 percent of union construction workers receive job-based health care. Declining job quality in the industry has led to serious health and safety concerns for workers and creates heavy costs for employers and the public. The Contractor shall provide basic safety training as well as refresher training to employees in reference to OSHA, WAC, and Port of Seattle Construction Project KL 3/7 requirements. Review listing of safety training required by OSHA for the construction industry. The poor quality of many of the jobs in the industry is due in part to declining unionization rates as well as a large informal sector whose workers are often paid in cash and lack basic protections afforded KL 3/8 employees. For retaining walls over 100 feet in length, the spacing between borings should be not longer than 200 feet.
It is the responsibility of the KL3/4 KL3/5 KL3/6 trench sheets to maintain detailed records of training for their employees. It is also the responsibility of the Contractor to ensure that safety rules, procedures, and requirements are effectively conveyed to non-English speaking personnel. Contractor shall ensure that sub-tiered contractors perform this training also. About 200,000 construction workers in the KL3/5 state and their family members rely on public assistance for health care and other basic needs at an estimated annual cost to taxpayers of $700 million, according to a 2002 UC Berkeley study. Contractor Safety Representative Meeting.It is a requirement of 01 35 29 – Safety Management that the Contractor’s TKL 3/9 Site Safety Representative attend the monthly Contractor Safety Representative Meeting scheduled by the Manager of Construction Safety Services. In general, for walls which do not utilize deep foundation support, subsurface explorations shall extend below the anticipated bearing level a minimum of twice the total wall height. This meeting KL3/4 is held to discuss and resolve relevant issues related to safety and health on POS construction projects. Greater depths may be required where warranted by local conditions.
Where the KL3/7 KL3/8 TKL3/9 trench sheeting is supported on deep foundations and for all nongravity walls, the depth of the subsurface explorations shall extend a minimum of 20 feet below the anticipated pile, shaft, or KL 3/6 slurry wall tip elevation. If the Contractor’s Safety Representative cannot attend this meeting, they shall send a designee in their place.