Grand Steel Piling
/ Knowledge /(HOESCH 2607, HOESCH 2807, HOESCH 3607, HOESCH 3807) Z profile sheet pile

(HOESCH 2607, HOESCH 2807, HOESCH 3607, HOESCH 3807) Z profile sheet pile

 

 

Section

Dimensions

Mass

Moment of inertia

Modulus of Section

Width

Height

Thickness

Per pile

Wall

w

h

t

s

 

 

 

 

mm

mm

mm

mm

kg/m

kg/m2

cm4/m

cm3/m

HOESCH 1208

770

354

8.5

8.5

73.2

95

1301

22995

HOESCH 1308

770

354

9

9

76.6

99.5

1357

24013

HOESCH 1408

770

355

9.5

9.5

80.1

104

1412

25030

HOESCH 1707

700

420

8.5

8.5

73.2

104.6

1731

36304

HOESCH 1807

700

420

9

9

76.7

109.5

1804

37894

HOESCH 1907

700

421

9.5

9.5

80.1

114.5

1878

39485

HOESCH 2007

700

421

10

10

83.6

119.4

1951

41076

HOESCH 2407

700

439

11

11

95.1

135.9

2432

53379

HOESCH 2607

700

440

12

12

102.5

146.5

2606

57329

HOESCH 2807

700

441

13

13

109.9

157

2779

61279

HOESCH 3607

700

499

17

11

118.1

168.8

3600

89826

HOESCH 3807

700

500

18

12

125.9

179.9

3800

95004

HOESCH 4007

700

501

19

13

133.7

191

3999

100184

HOESCH 4807

700

507

23.5

14.5

156.1

223.1

4760

120667

HOESCH 5007

700

508

24.5

15.5

164

234.3

4959

125966

HOESCH 5207

700

509

25.5

16.5

171.8

245.4

5158

161366

 

Z profile sheet pile a weir must HOESCH 2607 be designed to HOESCH 2807 operate satisfactorily HOESCH 3607 in all flow HOESCH 3807 conditions. Deflected HOESCH 2607 vertical force, which tends to shear HOESCH 2607 off projections beyond the face line of a HOESCH 2807 structure. Furthermore, access HOESCH 2807 across the concrete structures cannot HOESCH 3607 accommodate off-road haul vehicles or high frequency highway HOESCH 3607 haul vehicle usage.

 

Z profile steel sheet pile the ideal HOESCH2607 flow-gauging weir HOESCH2807 is capable of recording HOESCH3607 both high and low HOESCH3807 flows. Direct horizontal force of HOESCH 3807 impact and continued pressure, which HOESCH 3807 tends to overturn or slide. Consequently, HOESCH2607 other material sources and alternate HOESCH2607 haul methods were determined HOESCH2807 to be more feasible.

 

The nature of water HOESCH2807 flow over a weir depends on HOESCH3607 many factors. Engineers build breakwaters HOESCH3607 or jetties as protection for the inner water. The HOESCH3807 study team also examined using existing bridges and local roads to transport the materials, but HOESCH3807 determined that this alternative was not feasible or HOESCH2607 cost effective. During final development, planning depends on a full knowledge of the HOESCH3607 theater-wide logistical situation.