/ Roadworks around housing estate and small lake Swidon,UK
Roadworks around housing estate and small lake Swidon,UK
1500 tons of AZ18-700 produced by Grand Steel Piling in its China factory.In order to guarantee a good driving speed, the choice of the sheet pile section was paramount. In collaboration with Grand Piling' technical department, the design engineer opted for the AZ18-700. Its high stiffness allowed it to be driven with a vibratory hammer at least 1 m deeper than the pre-drilling, which guarantees sufficient embedment of the toe of the pile, and minimizes the deflections of the retaining wall.All sheet piles were supplied in cimped pairs.Length from 5.8-11.5m.The sheet piles were driven into ground very quickly,and clients were very happy with is.