Section | Dimensions | Mass | Modulus of Section | Moment of inertia | ||||
Width | Height | Thickness | Per pile | Wall | ||||
w | h | t | s | |||||
mm | mm | mm | mm | kg/m | kg/m2 | cm3/m | cm4/m | |
JZ17-700 | 700 | 419.5 | 8.5 | 8.5 | 73.2 | 104.6 | 1731 | 36304 |
JZ18-700 | 700 | 420 | 9 | 9 | 76.7 | 109.5 | 1804 | 37894 |
JZ19-700 | 700 | 420.5 | 9.5 | 9.5 | 80.1 | 114.5 | 1878 | 39485 |
JZ20-700 | 700 | 421 | 10 | 10 | 83.6 | 119.4 | 1951 | 41076 |
JZ24-700 | 700 | 439 | 11 | 11 | 95.1 | 135.9 | 2432 | 53379 |
JZ26-700 | 700 | 440 | 12 | 12 | 102.5 | 146.5 | 2606 | 57329 |
JZ28-700 | 700 | 441 | 13 | 13 | 109.9 | 157 | 2779 | 61279 |
JZ36-700 | 700 | 499 | 17 | 11 | 118.1 | 168.8 | 3600 | 89826 |
JZ38-700 | 700 | 500 | 18 | 12 | 125.9 | 179.9 | 3800 | 95004 |
JZ40-700 | 700 | 501 | 19 | 13 | 133.7 | 191 | 3999 | 100184 |
Sheet pile in the JZ36-700 new target pricing JZ38-700 contract, HA tenders the project with JZ40-700. Only feasibility plans and selects a contractor. It directly and immediately impacts on our quality of life.
Hot rolled sheet pile burden of JZ 36-700 tendering will be JZ 38-700 kept to a minimum by avoiding JZ 40-700 the need. As far as possible, for detailed design work during the tender stage. Risk schedules will be developed with offer as part of the quality .
Assessment process JZ36-700 and also to JZ38-700 identify a fair allocation of risks to the JZ40-700 parties best able to manage them. Decisions JZ 36-700 about what JZ 38-700 we build today, how and JZ 40-700 with what it is built, and how it can be maintained, have very long term consequences.